PROJECT SPOTLIGHT / ABU DHABI, UAE
125 m³/h.
A FAST approach to pond water treatment.
A factory-built modular equipment package for the Abu Dhabi Duck Pond project, combining the FAST tank platform with dedicated filtration equipment.

PROJECT AT A GLANCE
Engineered around
the application.
- Application
- Duck pond water treatment
- Location
- Abu Dhabi, United Arab Emirates
- Project capacity
- 125 m³/h
- Platform
- FAST modular tank system
- Milestone
- Manufacturing and factory acceptance testing completed
THE REQUIREMENT
A coordinated
treatment package.
Pond water treatment brings together several engineering considerations: water circulation, solids separation, equipment access and the interfaces between treatment stages.
For this project, the FAST modular platform forms part of a coordinated equipment package. Factory-built process tanks and filtration vessels are prepared together so their mechanical and control interfaces can be reviewed before site installation.

FROM ENGINEERING TO FACTORY REVIEW
The work behind
the equipment.
The project documentation covers equipment arrangements, mechanical and electrical interfaces, production preparation and factory acceptance testing.
YORA’s project involvement brings the equipment package and engineering coordination together. Manufacturing and factory acceptance testing have been completed, marking a milestone ahead of site delivery and commissioning.
Client identity and detailed site information are withheld for confidentiality.