Home / FAST systems / Abu Dhabi Duck Pond

PROJECT SPOTLIGHT / ABU DHABI, UAE

125 m³/h.
A FAST approach to pond water treatment.

A factory-built modular equipment package for the Abu Dhabi Duck Pond project, combining the FAST tank platform with dedicated filtration equipment.

FAST modular process tank for the Abu Dhabi Duck Pond project at the factory
FAST modular process equipment during factory preparation.

PROJECT AT A GLANCE

Engineered around
the application.

Application
Duck pond water treatment
Location
Abu Dhabi, United Arab Emirates
Project capacity
125 m³/h
Platform
FAST modular tank system
Milestone
Manufacturing and factory acceptance testing completed

THE REQUIREMENT

A coordinated
treatment package.

Pond water treatment brings together several engineering considerations: water circulation, solids separation, equipment access and the interfaces between treatment stages.

For this project, the FAST modular platform forms part of a coordinated equipment package. Factory-built process tanks and filtration vessels are prepared together so their mechanical and control interfaces can be reviewed before site installation.

YORA-branded filtration vessels prepared for the Abu Dhabi Duck Pond project
Filtration vessels forming part of the project equipment package.

FROM ENGINEERING TO FACTORY REVIEW

The work behind
the equipment.

The project documentation covers equipment arrangements, mechanical and electrical interfaces, production preparation and factory acceptance testing.

YORA’s project involvement brings the equipment package and engineering coordination together. Manufacturing and factory acceptance testing have been completed, marking a milestone ahead of site delivery and commissioning.

Client identity and detailed site information are withheld for confidentiality.